国产超薄丝袜足底脚交国产_少妇愉情理伦片丰满丰满_一区二区三区中文人妻制服_久久久久88色偷偷免费_色婷婷久久久swag精品

萬能百科  > 所屬分類  > 

Each box is an activity; the number it contains is the duration of the activity

Each box is an activity; the number it contains is the duration of the activity in days. The duration of the critical path is(75)

A.16days

B.14days

C.19days

D.20days

正確答案:

C解析:關鍵路徑為最長時間的線路,3+6+7+1+2=19。

詞條內(nèi)容僅供參考,如果您需要解決具體問題
(尤其在法律、醫(yī)學等領域),建議您咨詢相關領域?qū)I(yè)人士。

標簽